Update - Chief's Office July 25, 2006
Posted On: Jul 206, 2006
To All,

With the changing of the guard in certain positions within the City the Mayor has authorized me to head up the completion of the fire school. To that end the Public Works department has been working over the last few days on preparing the grounds for safer use. The following is noted for your additional information and input.
  • Heat resistant tiles are now in place. They will need to have a couple of "break-in" burns. There is then an adjustment to hardware to be made to them.
  • A portion of the side B fence is being removed to provide replacement for the area lost for the "Bill Buckley" memorial road straightening project.
  • Road grindings and leveling of the grounds is proceeding and will be complete this week.
  • The new fence will include a wider, better positioned truck entrance on side A and a pedestrian walk-thru and parking area on side B.
  • Hydrants are operational
  • We will need assistance in the removal of the trailer which was stored by Engineering on our property. Ideas are welcomed.
  • It is still the goal to ultimately remove both trailers and have a classroom shower facility in place.
  • Once the grindings are in place we can set the mock-ups that several individuals have been working on.

Thank you for your participation and input.

Peter J. Siecienski
Fire Chief/EMD
19 New Street
Danbury, Connecticut 06810
203-796-1555
203-796-1533 Fax

-
IAFF Local 801
P. O. Box 901
Danbury, Connecticut 06813
  203.743-2415


Top of Page image
© 2026 IAFF Local 801 | Privacy Policy & Terms of Service | Powered By UnionActive